May 10 2025TECHNOLOGY
Lunar Mission Delayed: The Engine Switch-Up
A lunar mission, backed by NASA, is facing a setback due to an engine change. The project, involving a lunar lander built by ispace U. S. , was initially set to launch in 2026. However, the switch to a new engine, called VoidRunner, has pushed the launch date to 2027. The original plan involved using an engine from Agile Space Industries, the A2200. This engine was ...
reading time about 1 minute